Traffic signals will be installed at the I-39/US 51 northbound on/off ramp. WIS 66 work and I39/US 51 on and off ramp work consists of an asphalt resurface. WIS 66, 100-200 feet beyond the I-39/US 51 on/off ramps in Stevens Point, 0.017 miles, mid-April-July 2021. Construction is expected to be about one month per site and could be done concurrently. Traffic will be reduced to one-lane controlled with temporary traffic signals. Little Roche-A-Cri Creek bridge will receive new bridge wingwalls and the steel beams at Carter Creek will be painted. WIS 13, bridges at Little Roche-A-Cri Creek and Carter Creek, August-October 2021.īoth bridges will receive a new concrete deck overlay and polymer overlay. This is also part of a detour route for construction projects on WIS 82. Holiday work restrictions will be in place for Memorial Day and Independence Day weekends. Emergency vehicle access will be maintained. Motorists can expect bi-directional traffic, single lane closures with flagging or shoulder closures. One lane of traffic in each direction will be maintained. The north end of the guardrail along northbound WIS 13, north of the bridge over Waubeek Road, will be repaired and extended. Curb and gutter and concrete median will be replaced in spot locations. Work consists of removing the top layer of asphalt and replacing with a new asphalt surface in the driving lanes and shoulder. WIS 13, from the Columbia County line to approximately 1700 feet north of Golden Avenue in the town of Dell Prairie, 2.5 miles, May-June 2021. No material or equipment hauling to or from the project will be allowed during the Memorial Day, Independence Day, or Labor Day holiday weekends. The asphalt overlay at the bridge over Neenah Creek will be completed under a single lane closure with flagging. During culvert replacement operations, affected side roads may be closed to local traffic during daytime working hours. WIS 82 will be closed to through traffic utilizing a posted detour of WIS 13, WIS 23 and I-39/US 51 during pavement replacement operations. The WIS 82 bridge over Neenah Creek will receive a new asphalt overlay. A storm drain and outfall at 10th Avenue will be added. Six culverts will be replaced along WIS 82 along with four others at Eighth and Ninth avenues. Work consists of replacing the concrete pavement along with improvements to the layer of gravel material under the pavement where needed existing gravel shoulders will be restored. WIS 82, from WIS 13 in the town of Springville to approximately 450 feet east of the County B intersection in the town of Jackson, about six miles, mid-April-October 2021. Access to residents and businesses along the corridor will be maintained throughout the project. Traffic will be detoured via WIS 13, WIS 23, and I-39. WIS 82 will be closed to through traffic for the duration of the project. The project also includes guardrail replacement, curb and gutter, and culvert pipe repairs. This project constructs new concrete pavement and new gravel base. WIS 82, County B to the Marquette County line, April-July 2021 highway projects in Adams, Portage, and Wood counties include the following MADISON – The Wisconsin Department of Transportation North Central Region has released its first annual construction preview of all road construction projects taking place in 2021.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |